•  
  •  
 
International Journal of Applied Management and Technology

Abstract

Job shop scheduling is one of the most explored areas in the last few decades. Although it is very commonly witnessed in real-life situations, very less investigation has been carried out in scheduling operations of multi-level jobs, which undergo serial, parallel, and assembly operations in an assembly job shop. In this work, some of the dispatch rules, which have best performances in scheduling multilevel jobs in dynamic assembly job shop, are tested in static assembly job shop environment. A new optimization heuristic based on Ant Colony Algorithm is proposed and its performance is compared with the dispatch rules.

Share

COinS